I was asked to measure and mark out the locations of the holes to enable a contracted core driller to drill the holes required for the fencing and for the ideal location for the step up in the wall by the groundsman. Once the wall was finished and holes ready for us we installed the post into the holes using a wet mix concrete.
Had a few issues on this one, some onsite welding of lugs, cutting and welding a gate to make it wider and closing of some gaps all due to manufacturing issues. Nothing that couldn’t be handled and it looked good when completed.

