The job was to take down and clear the existing fencing from site including some shrub along the line. Then to erect 1.8m high (6ft) closed board panel fencing with slotted concrete posts and recessed gravel boards
It turned out well, nice even stepping and concrete posts will last a lot longer than the previous timber posts
The cool thing about this job was the bacon sandwich we were given for breakfast and the pack of ginger nut biscuits with coffee, lovely!