Post and Mesh Panel Bolt Down

We created secure areas in a maintenance level of school by installing 358 mesh panels in frames which were then bolted to posts which in turn were fixed to the floor using resin anchors.

We had to work in close proximity to others on this site which was ok after organising with the others which areas were best to work on first.